Official-source Sarkari job alerts · रोज नई भर्ती की जानकारी

Cauvery V Stage achieves over 50% coverage, easing summer drinking water availability in Bengaluru
Image source: thehindu.com

GK and monthly revision

Cauvery V Stage achieves over 50% coverage, easing summer drinking water availability in Bengaluru

The Cauvery V Stage project, commissioned in October 2024, has achieved over 50% coverage in Bengaluru, providing 1.75 lakh connections and 400 MLD of drinking water. This development eases the city's summer water availability, as the project was allocated 775 MLD for a target of over 3 lakh connections. The project's progress is significant as it addresses the growing water demand in Bengaluru, a key issue for competitive exam preparation.

UPSCSSCBANKINGRAILWAYSTATE PSCTEACHING

Revision structure

Monthly events and exam calendar context
Static GK and one-liner notes
Quiz and mock-test revision path

How to study

Turn news into exam marks

Revise monthly events by exam family instead of reading random updates.

Pair one-liners with mock tests so mistakes become the next revision list.

Keep state job pages, calendar pages and GK packs connected in one path.